1. WorldAtlas/
  2. United States/
  3. Minnesota/
  4. Eveleth-Virginia Municipal Airport

Eveleth-Virginia Municipal Airport (EVM)

Eveleth-Virginia Municipal Airport location on a map

Eveleth-Virginia Municipal Airport is a regional airport in Eveleth, Minnesota, United States. Its IATA code is EVM and is located latitude 47.42 and longitude -92.50 in United States and operates in CDT time zone which is the same time zone as Minneapolis.

Is used primarily for civil, private or non-scheduled commercial flights.

It has 2 runways that allow night landings, and can support most single engine aircraft, light twins, most business jets and smaller commuter aircraft.

Airport Information

IATA Code EVM
Latitude 47.42410000
Longitude -92.49769000
City Eveleth

Runways

Code Length Width Surface Lighted
05/23 2685 ft / 818 m 110 ft / 33 m GRS No
09/27 4215 ft / 1284 m 100 ft / 30 m ASP Yes
14/32 2506 ft / 763 m 100 ft / 30 m ASP Yes

Trending on WorldAtlas